After Eco-Soil Stabilizer treatment, the PVR is typically reduced to approximately 1 inch or less – a roughly 80% improvement!
With the PVR reduced, the need to remove the clay soil and replace with select fill is not necessary. This in turn reduces construction time and costs, saving developers and builders time and money.
Member Since: 2020